Our largest most involved project to date has been on-going since July 2018. We have been an integral part of the team that has undertaken a large development of the distribution centre at Barfoot Foods. Key tasks that we have undertaken are:
The installation of the 115,000 litre water storage tank was a complex operation. The large excavation area was de-watered using pumps in the surrounding Mabey form work and the tank was lifted in place with 100 tonne crane.